Cabinet Installation Underway | Exterior Stone Near Completion
Cabinet installation is officially underway, bringing the interior one step closer to completion. At the same time, exterior stonework is nearing the finish line — adding character, texture, and curb appeal to the home.
It’s exciting to see both interior and exterior details coming together!
Inside & Out: Finishes in Motion
We’re making strong progress inside and out. Exterior stone work is coming together as we near the finish on the façade, adding character and curb appeal. Inside, cabinet installation is officially underway—bringing function, storage, and design to life room by room.
It’s exciting to see both the exterior and interior take shape at the same time as we move closer to the next phase.
Permanent Power Going In
A big milestone on site—permanent power is being installed. This step transitions the home off temporary construction power and onto its permanent electrical service, allowing systems to be fully tested and safely operated.
With permanent power in place, crews can move forward more efficiently as we continue into interior finishes, inspections, and final installations. One more critical step bringing this custom home closer to completion.
Progress from Every Angle
From inside to out, this home is coming together beautifully. ✨
• Inside, statement tile installation is underway, creating a bold, spa-like focal point that sets the tone for the space.
• Structural details and natural light are coming together inside, giving a glimpse of the open, airy feel this home will have once complete.
• Outside, stone masonry continues to transform the façade, adding texture, depth, and timeless character.
Every detail is thoughtfully executed as this custom home takes shape. Stay tuned—more exciting progress ahead
Stone, Trim & Outdoor Kitchen Progress
Exterior stone work is moving right along, adding character and texture to the home’s façade. The exterior grill area framing is now completed and prepped for its stone installation next. Inside, our trim carpenters are continuing their detailed work as the interior starts to take shape.
Outdoor Living Space Taking Shape
The Trex® decking has been fully installed and is now covered for protection while we move into the next phase. This keeps the surface clean and damage-free as crews continue working around it.
Up next: installation of the handrails and the exterior heavy beams—key elements that will define the outdoor living space and bring this design to life.
Details Taking Shape
Work is moving forward on multiple fronts. We’re continuing with exterior stone installation while tile work progresses inside the home, adding character and detail throughout. Up next will be the installation of the garage doors as we keep the momentum going.
Interior & Exterior Finishes Making Big Strides
A lot of great progress this week! Interior trim is coming together, tile installation is well underway, and our exterior stone is taking shape beautifully. Loving how everything is coming together!
Bringing the Details to Life: Siding & Interior Trim Underway
Siding installation continues to move along as our exterior starts taking shape with clean lines and detailed craftsmanship. Inside, the trim crew is making great progress—adding casings, baseboards, and finishing details that really bring the interior architecture to life.
Both teams are pushing forward seamlessly, and the home is transforming more every day.
Exterior Details Rising, Interior Installations Next
Exterior beams, trim, and siding are well underway, giving the home its architectural character and bringing the exterior design to life. Meanwhile, all interior trim, beams, and doors have officially been delivered—which means we’re ready to kick off interior installations next.
It’s an exciting phase where both the outside and inside start taking shape at the same time. Lots of progress happening—stay tuned!