Cothron Residence Updates

Irma Chlepko Irma Chlepko

Low-Voltage & HVAC Installation Underway

This week, the low-voltage crew is on site, keeping all the wiring and smart systems on track. At the same time, Stuart Pro is making progress with the HVAC installation, bringing comfort and efficiency to the home. Steady progress inside!

Read More
Irma Chlepko Irma Chlepko

Electrical Wiring in Progress

The electrical crew is on site pulling wire throughout the home! This critical step ensures that every outlet, light, and appliance will have the proper connections and power it needs. Precision is key here—everything is carefully routed to meet both the design plan and safety standards.

With wiring underway, we’re one step closer to making this home fully functional and ready for the next phase.

Read More
Irma Chlepko Irma Chlepko

Shaping the Systems

HVAC rough-in is nearly complete.
This stage is all about getting the home’s comfort systems in place — making sure airflow, temperature control, and overall efficiency are built right from the start.

Next up: electrical rough-in.
This is where lighting plans, outlets, switches, and all the little conveniences of daily living start to take shape behind the walls. Every detail matters here — it’s the foundation of how the home will feel and function.

Read More
Irma Chlepko Irma Chlepko

Behind the Walls: Mechanical Rough-In in Progress

Mechanical rough-in is in full swing!
This phase is where all the behind-the-walls systems start coming together — HVAC ducts, plumbing lines, and electrical wiring are being carefully installed before insulation and drywall go up. It’s one of the most critical stages to ensure everything functions perfectly once the home is complete.

Every connection, vent, and line is precisely planned to balance efficiency, comfort, and long-term performance — setting the stage for a home that works as beautifully as it looks.

Read More
Irma Chlepko Irma Chlepko

Finishing Plumbing Rough-In and Moving to HVAC!

We’re wrapping up the final stages of plumbing rough-in and moving on to HVAC rough next! This phase includes running all the ductwork, setting air returns, and prepping for vents before drywall goes up. It’s all about making sure the home will have efficient heating and cooling for years to come.

Read More
Irma Chlepko Irma Chlepko

Plumbing Rough-Ins Underway

Plumbing crew is on site running new rough-ins! Each line and connection is being carefully installed to set the groundwork for the home’s future kitchens, baths, and utilities.

Read More
Irma Chlepko Irma Chlepko

Next Up: HVAC Rough-In

With the plumbing rough-in complete, we will be moving right into the HVAC rough phase. Each stage builds on the last — setting up the essential systems that bring comfort and efficiency to every home we build. Steady progress continues!

Read More
Irma Chlepko Irma Chlepko

Doors & Windows Installed: Building Envelope Secured

On-site progress update: door and window installation is underway. This crucial phase seals the building envelope, boosts structural performance, and primes the home for interior systems. We’re installing Pella windows, backed by industry-leading warranty coverage that gives lasting peace of mind:

  • Non-glass components (frame, sash, hardware) are covered under a Limited Lifetime Warranty for as long as the original homeowner occupies the residence (for owner-occupied, single-family homes).

  • Standard non-laminated insulating glass carries a 20-year limited warranty.

  • Laminated glass (when used) is typically warranted for 10 years.

  • Labor costs for repairs or replacement parts are included in the warranty for the first two years.

    With Pella’s warranty structure, future homeowners benefit from robust protection across key components—and confidence that this investment is supported by long-term coverage.

Read More
Irma Chlepko Irma Chlepko

Rough-In Plumbing Continues

Continuing with rough-in plumbing where we left off 🚰🔧 Getting all the behind-the-walls work in place so the next phases of construction can flow smoothly.

Read More
Irma Chlepko Irma Chlepko

Fine-Tuning the Details

Making some framing adjustments to get everything just right! 🛠️ Brick samples are installed, now we’re waiting on the final decision before moving forward. Excited to see how this one comes together!

Read More
Irma Chlepko Irma Chlepko

From Sample to Stunning Finish

With brick samples now installed, we’re preparing for the next big step: full brick installation as soon as final selections are made. Every choice brings the exterior design closer to its stunning final vision!

Read More
Irma Chlepko Irma Chlepko

Brick Selection Time

Three brick samples are now in place, ready for client review and selection. Each choice made brings us one step closer to shaping the final look of this home.

Read More
Irma Chlepko Irma Chlepko

Next Phase of Construction Begins

With the updated design finalized and agreed upon, we’re excited to move forward with the next phase of this project. Every detail is carefully considered to ensure the finished home reflects both vision and functionality. Progress ahead!

Read More
Irma Chlepko Irma Chlepko

Paused for Redesign, Ready to Move Forward Soon

Our field team is currently on pause while we work through some important redesign details. We're focused on getting everything just right and hope to have things moving forward on site as soon as possible. Thanks for your patience—exciting progress is on the horizon!

Read More
Irma Chlepko Irma Chlepko

Refining the Vision

Our field team is taking a short break while we make a few design adjustments behind the scenes. It’s all part of the process to make sure every detail is just right before moving forward!

Read More
Irma Chlepko Irma Chlepko

Skilled Crews Advancing Exterior and Electrical Work

Things are moving quickly on site! Our siding and soffit crew of four is hard at work, while the electrical crew of five is making progress with electrical rough-in. Every team plays a vital role in bringing this home to life.

Read More
Irma Chlepko Irma Chlepko

Plumbing Installation Underway to Ensure Smooth Next Phase

For a project of this scale, precise coordination is critical. We’re currently advancing with the plumbing rough-in, ensuring all systems are correctly installed and inspected before proceeding to the next construction phase. Proper sequencing now helps prevent costly delays down the line.

Read More
Irma Chlepko Irma Chlepko

Siding Progress & Plumbing Wrap-Up

Siding installation is underway on the back of the house, giving the exterior a major progress boost. Inside, plumbing drains are mostly complete, keeping us on track for the next phase.

Read More
Irma Chlepko Irma Chlepko

Drainage Rough-In Underway

Our plumbing crew is back on site and continuing their work—currently roughing in drainage lines to ensure everything flows smoothly behind the walls. Another essential step toward bringing this home to life!

Read More
Irma Chlepko Irma Chlepko

Design Preview: Den Beam Layout & Bath 6 Updates

We’re excited to share the latest renderings of the Den beam layout—bringing warmth, structure, and architectural interest to the space. Also, check out the updates in Bath 6, where design and function come together in a clean, elevated palette.

These renderings help us visualize and fine-tune every detail before execution—and we can’t wait to bring them to life!

Read More