Corbitt Residence Updates

Irma Chlepko Irma Chlepko

Defining the Exterior

Exterior beams and trim work are underway, adding depth, character, and architectural detail to the façade. This is where the craftsmanship really starts to shine — where structure meets design and the home begins to show its personality from the outside in.

Read More
Irma Chlepko Irma Chlepko

Drywall Complete: Finishing and Curing in Progress

Drywall installation is complete, and the finishing process is underway! After hanging the drywall sheets, we apply multiple layers of joint compound to cover seams, screw holes, and corners — creating a perfectly smooth surface for paint and finishes. Each coat needs time to dry and cure properly to prevent cracking or uneven texture, so patience is key during this stage.

Once fully cured, the walls will be sanded and prepped for primer — bringing us one step closer to a finished interior!

Read More
Irma Chlepko Irma Chlepko

Drywall Installation Underway!

Drywall is moving right along! Each room is really starting to take shape as the walls go up — an exciting step toward seeing the finished spaces come to life

Read More
Irma Chlepko Irma Chlepko

Ready for Drywall and Exterior Finishes

Interior and exterior progress moving right along! Insulation is complete, and drywall has arrived on site — hangers will begin tomorrow. Outside, soffits are getting wrapped with siding, adding the next layer of detail to the exterior.

All Sisson materials are finally in, and utilities have been marked on the floor ahead of drywall installation — setting us up for a smooth next phase.

Read More
Irma Chlepko Irma Chlepko

Cleared for the Next Phase

360 pre-drywall photos. You can click on any red dots in the floor plan and it will open up the 360 picture of that location.

Plumbing rough-in inspection ✅ — we’re cleared and ready to move into the next phase!

In the meantime, we’ve captured detailed pre-drywall photos throughout the home. These images document everything behind the walls — plumbing, electrical, HVAC, and framing — ensuring we have a precise record before finishes go in. It’s all part of maintaining quality and transparency at every stage.

Read More
Irma Chlepko Irma Chlepko

Gas Lines in Progress: Hard Pipe & Coil Installation Underway

Our gas line crew is hard at work, running both hard pipe and coil throughout the home. Proper gas line installation is essential for safety, efficiency, and reliable performance for all appliances. Every connection they make ensures the home is ready for comfortable, everyday living.

Read More
Irma Chlepko Irma Chlepko

Low-Voltage Work Underway

Low-voltage installation is in progress! From smart wiring to security and audio connections, every detail is being set up to keep this home connected, efficient, and future-ready.

Read More
Irma Chlepko Irma Chlepko

Rough-Ins & Stone Selections

Continuing with HVAC and plumbing rough-in installation—things are really starting to take shape! Stone samples are installed and ready for the final decision. Excited to see these design choices come together!

Read More
Irma Chlepko Irma Chlepko

HVAC & Plumbing Rough-Ins Underway

Mechanical installations are underway as the HVAC crew continues ductwork installation and the plumbing crew progresses on system rough-ins. These critical steps ensure comfort and efficiency throughout the home and move us closer to the next stage of construction.

Read More
Irma Chlepko Irma Chlepko

Shaping What’s to Come

The roof is taking shape, our stone sample is complete, and plumbing drains are now installed. Each of these steps lays the foundation for the craftsmanship and luxury design to come. The vision is moving from plans to reality, and the transformation is well underway!